Structural parts of your unit, such as slabs, beams, columns and structural walls, cannot be altered without a Professional Engineer's assessment and the Commissioner of Building Control's approval. Changes to external features such as windows and walls need approval from the MCST and the relevant government agencies. Additions that change the building's look, such as awnings, need the MCST's permission. Works that add to the estate's total gross floor area need a 90% resolution of the MCST and may need URA and BCA approval.
Source: www1.bca.gov.sg, checked 21 Nov 2026. Rules change, and the official page is the authority. General information, not legal, tax or financial advice.
Ask the agent about your own case
Who can I hire to renovate my HDB flat?
Do electrical, aircon and wall works in an HDB flat need special contractors?
Who can replace or repair windows in my HDB flat?
Can I hack the bathroom tiles in a new HDB flat?
My renovation contractor did poor work. Where can I claim?
I own a conserved house. Do I need permission to renovate?